Situation:

Municipal cogeneration utility required smaller state of the art water treatment system. Source water was a very hard city water supply in southern Minnesota.

Challenges:

Customer requested an all-bus control solution featuring AS-i, Foundation Fieldbus, and DeviceNet protocols, the latest control technology, to communicate with the distributed control center (DCS).

Solution:

The following approach was taken for the water treatment system:

  • ASi network for discrete signals (valves, alarms and other I/O)
  • Foundation Fieldbus for process variables (flows, pressures, etc.)
  • DeviceNet for pump motors and VFD's

The duplex multi-media filter, duplex water softener, reverse osmosis system and EDI system were constructed with 316L stainless steel pipe.

Results:

A Factory Acceptance Test (FAT) was completed. All components operated successfully. The customer is in the process of scheduling installation of the equipment. We will support startup when it is scheduled.